Prairie Ag FundingCheck your project

RALP: Sulphate Water Treatment

Treat unsuitable livestock water with a plan for the wastewater.

Check the program rules and your existing records before you apply. Our listed service is a written review with a clear next step. Application writing and claims are not included in this review.

Pre-approval requiredChecked November 16, 2026
A black bull standing in a green Saskatchewan pasture behind a fence
Project-type photography. This is not a client case study.
Program support
50% for treatment; 75% for a required pondBoth categories share a maximum $20,000 payment. Treatment is funded to an acceptable livestock drinking standard, not a human drinking-water standard.
Pre-approval application deadline
September 30, 2027, or earlier if fully allocatedSubject to program terms and available funding.
Our starting point
C$995Standalone review. Application work is not included. The first conversation is free.

PROGRAM FIT

Check the conditions
before the commitment.

Work through the Ministry specialist for water testing and pre-approval. A holding or evaporation pond is required when treatment generates wastewater. Complete any required engineering before funding can be issued. Review the Agri-Environmental Risk Assessment and obtain required permissions before work. Complete the approved project and claim within 18 months of approval or February 1, 2028, whichever is earlier.

What may fit

  • Saskatchewan producers generally need at least C$50,000 gross farm income in the application year or the previous year. First Nations, qualifying new entrants and eligible pasture associations have specific rules. Livestock projects need a valid premises identification number where required.
  • Qualifying reverse-osmosis or other eligible treatment technology
  • Installation and qualifying permanent water storage
  • Required lined wastewater holding or evaporation pond
  • Eligible pond design, soil testing and exclusion fencing

What needs care

  • Treatment-system maintenance and production expansion
  • New wells or dugouts and treatment solely to human drinking standards
  • Application-support fees, in-kind labour and leased equipment

THE SCOPE OF OUR WORK

What we take
off your desk.

Check the fit before we commit

01
Your first written deliverable
IncludedWhat we handle
✓Check the livestock-water problem and animal-unit requirement.
✓Identify treatment and wastewater categories and their different rates.
✓Define the application scope and technical records needed.

You get our findings in writing, including a recommendation to stop if the project does not fit. This is our assessment, not a funding decision.

This price covers the review and a call of up to 30 minutes. Application preparation, submission, claims and appeals are not included. You can use the review to apply yourself.

The standard boundary

One applicant, one project and a review of the records you already have, with a written recommendation and a call of up to 30 minutes. We do not prepare or submit the application, contact officials to seek an award, write technical plans or handle a claim under this price.

One applicant and the stated project. Additional sites, practices, applications, significant redesigns or further reporting receive a separate fixed quote before work starts. No added work or fees without your agreement.

BEFORE WE START

The records that
make the file possible.

  • Applicant, farm-income, PID and livestock records
  • Water test results and specialist confirmation of treatment need
  • Treatment supplier specifications and itemized quote
  • Wastewater plan, pond information and engineering where required
  • Site location, permissions and separated treatment/pond budget

What stays with you

  • Provide complete, accurate records, review the package, and sign and submit your own application.
  • Arrange required technical work, landowner consent, permits and approvals before the work that needs them.
  • Select and pay suppliers, cover your share and excluded costs, and retain invoices and proof of payment.
  • Complete the approved work and reports on time, disclose other funding, and meet continuing program obligations.

Send a short summary through the enquiry form. Your file lead will agree a method for confidential records before you share financial statements or identification.

A FEW PRACTICAL QUESTIONS

Before you decide.

Can I claim your application fee?

Saskatchewan explicitly excludes third-party application-support fees. Listed technical or engineering costs are separate. Budget our fee as your own expense.

Can treatment discharge go into a nearby watercourse?

The rules prohibit discharge into nearby waterbodies or watercourses outside the operator's control. A compliant wastewater arrangement is essential.

Is a wastewater pond optional?

A holding or evaporation pond is required when the system generates wastewater. Required separation, lining and engineering conditions must be addressed.

What if I decide not to continue after the review?

You keep the review. No further work starts without your agreement. On a funding-linked agreement, an ordinary refusal means no success balance. Fixed services remain payable for completed work. Cancellation and project changes are explained on the fee page and in your agreement.

Can I apply without hiring you?

Yes. You can apply directly to the administrator. We recommend that route when the file is straightforward or the likely funding benefit does not justify our fee.

A FREE FIRST CHECK

Tell us where
the project stands.

Start with the basics. We will show what to confirm next, then you can choose to send an enquiry.

Your answers stay in this browser until you choose to continue to the enquiry form and submit it. This is not a funding decision or an authorization for paid work.

Prefer to describe the project in your own words?

No name, email or documents required here.